
『air flow measurement|heat flow meter』Related information(v cone flow meter|rotary gas meter|gallon meter|gear meter|metal tube rotameter|glass tube rotameter|nutating disk meter|transit time ultrasonic flow meter|wedge flow meter|pd meters|hydraulic flow meter|ultrasonic water flow meter|water flow meter|air flow meter|magnetic water flow meter|oxygen flow meter|gas flow meter|argon flow meter|air velocity meter|gasoline flow meter|fuel flow meter|ultrasonic water meter|digital water meter|nitrogen flow meter|solid flow meter|Oxygen tank flow meter|digital water flow meter|diesel fuel flow meter|steam flow meter|02 flow meter|compressed air flow meter|oil flow meter|liquid flow meter)

1. Request English translation: h2>
Winter (Tianjin) fluid technology development Limited is a company specializing in high pressure, high pressure fluid connector; a high pressure fluid valves and industrial fluid quick connector design R & D and production of the manufacturers, is now with several well-known foreign fluid technology company has established long-term cooperative research and development and supply relationship, and services covering all walks of life! The company"s business is divided into:A. fluid connection technology: precision cold drawn steel tube, copper tube, multiple core pipe, pipe, pipe assembly, industrial hose, hydraulic hose assembly, SAE flange, card sets of joints, high pressure ball valve, needle valve, DIN pipe clamp, quick change connector.B. sensing technology: temperature, pressure, flow, air tightness measurement and control products;C. professional equipment: leading international card sets of joints installation machine, expanding machine, deburring machine, bending machine, pipe molding equipment, hydraulic pneumatic complete sets of equipment.D. PTFE finished and semi-finished products (hydraulic pneumatic seals, guiding belt), PTFE, PEEK, PFA seats and components made of.
2. Can an English expert help me translate a passage about geology?
Ideally, the distribution of ore in a mineral deposit should be established, as shown in Figure 1B. This figure shows two aspects, but in reality, the resting particles on the mineral deposit should be placed in the other particles in the third dimension.. Embedding fine particles into coarse ones will create a more permeable mineral layer, allowing the solution and air to flow freely and uniformly through the pile


Hot News
Related AD
